Description
Located in Boss Gardens, it stands out for its quality and comfort.
The building will be situated in Paranhos, with excellent access to the center of Porto and the main business, education, health, and entertainment services.
Boss Gardens has been designed to maximize the benefits of outdoor space and green areas for all its residents.
The existing private garden allows for walks and enjoying leisure moments with children and pets.
Given that Paranhos is part of the largest university hub in Porto (which includes some of the most prestigious universities and colleges in the city), this is an excellent investment, both for personal housing and for rental income.
There will be 41 modern apartments, with T1, T2, and T3 configurations, some of which will have balconies, terraces, and private gardens.
T1 apartments have 1 parking space.
T2 apartments have 1 parking space.
T3 apartments have 2 parking spaces.
FINISHING MAP:
STRUCTURE
Reinforced concrete with solid slabs.
FACADE
Exterior cladding in exposed concrete and ceramic resembling wood.
High acoustic and thermal insulation.
EXTERNAL JOINERY
Lacquered aluminum in RAL 9007 color, double-glazed with high acoustic insulation.
INTERNAL JOINERY
Smooth white lacquered doors with matte chrome fittings.
Security entrance door.
Built-in wardrobes with white lacquered doors and melamine 'Linho Cancun' interior lining.
Lacquered skirting boards.
WALL COVERING Housing
Hall, corridor, living room, kitchen, laundry, bedrooms: projected plaster and final finish with plastic paint.
Bathrooms: plastered walls with waterproof plaster and final ceramic cladding from 'Love Tiles' or equivalent. Common areas
Entrance and landings: ceramic wainscoting and final finish with plastic paint.
Stairs: projected plaster and final finish with plastic paint.
CEILING COVERING Housing
Hall, corridor: false ceilings with lighting and final finish with plastic paint.
Living room, bedrooms: false ceilings with curtain tracks, lighting, and final finish with plastic paint.
Kitchen, laundry, bathrooms: false ceilings with lighting and final finish with plastic paint. Common areas
Entrance and landings: false ceilings with lighting and final finish with plastic paint.
Stairwell: projected plaster and final finish with plastic paint.
FLOORS Housing
Kitchen, laundry: vinyl floating floor from 'JULAR' or equivalent.
Hall, corridor, living room, bedrooms: vinyl floating floor from 'JULAR' or equivalent.
Terrace, balcony: ceramic flooring.
Bathrooms: ceramic flooring from 'Love Tiles' 60x60 or equivalent.
Common areas
Entrance: ceramic flooring.
Landings: ceramic flooring.
Stairs: exposed concrete and technical flooring from 'Margres' or equivalent.
SANITARY FIXTURES
Wall-hung toilet/bidet from 'Roca,' series 'ONA' or equivalent.
Vanity unit with a compact top.
Mixer tap from 'Hansgrohe,' series 'Vernis Blend' or equivalent.
CLIMATE CONTROL AND HOT WATER HEATING
Heat pump system for sanitary hot water (AQS).
Multi-split system for climate control (heating/cooling).
Electric towel rails in bathrooms (excluding the social WC).
KITCHEN
Single-lever mixer tap.
Stainless steel built-in sink.
Upper and lower kitchen cabinets with matte thermo-laminated fronts, with a compact worktop.
Appliances from 'Bosch' or equivalent: dishwasher, oven, induction hob, microwave, refrigerator.
ELECTRICAL INSTALLATIONS
Video intercom.
TDT TV installation.
TV and telephone sockets (living room, bedrooms, and kitchen).
Basic home automation: lighting, heating/cooling, and blinds.
'Screen' blinds with electric blackout.
Electrical installation in the garage suitable for electric vehicle charging, in accordance with current legislation.
Payment Conditions:
10% CPCV (5% upon signing + 5% at the start of construction)
40% DURING THE WORK
10% upon completion of the structure
10% upon completion of masonry
10% upon completion of joinery
10% upon completion of carpentry
50% at the deed
Expected start of construction - First quarter of 2024 Expected completion - 30 to 36 months
Energy Rating: A