Description
Exclusive development of 5 contemporary style houses in Llafranc, one of the most beautiful fishing villages on the Costa Brava.
This development of detached houses with garden area and communal pool, stands out for its excellent location. It is only 300 meters from the beautiful beach of Llafranc, its restaurants on the seafront, the port and the Camino de Ronda. Its location is ideal for walking along the promenade and reach Calella de Palafrugell from the coastal road, it is a very nice walk and only takes 10 minutes. The village of Llafranc offers tranquility, it is ideal to relax and disconnect, and offers nature, to practice your favorite sports.
These fantastic villas are distributed on 2 levels:
The main floor is intended for the day area and consists of a large open space consisting of a bright living room, dining room and fully equipped kitchen, a perfect place to relax and enjoy the company of family and friends. From this room we can access a large porch and the rest of the garden. A complete bathroom completes this floor.
The upper floor is intended for the sleeping area. It has four double bedrooms, which makes it ideal for large families or to receive guests. The master bedroom is a large and bright space with an en suite bathroom for comfort. The remaining bedrooms are also spacious and bright, and have fitted closets for storing clothes. The shared full bathroom is practical and functional.
On the subway level we find a parking space for 2 cars, a laundry room, a possible space for a wine cellar and a machine room.
All levels are connected by an internal staircase.
There are 2 types of houses TYPE 1 and TYPE 2, they are differentiated by the square meters.
Constructed surfaces:
HOUSE TYPE 1:
GROUND FLOOR 64,3 m2
GROUND FLOOR 64,3 m2
1st FLOOR 86,48 m2
TOTAL 215,08 m2
HOUSE TYPE 2:
SUB GROUND FLOOR 68,63 m2
GROUND FLOOR 68,62 m2
1st FLOOR. 83,95 m2
TOTAL 221,19 m2
Observations: Efficient houses with energy classification A, very low energy consumption. Heating and air conditioning system integrated in false ceilings. Pre-installation for 2 electric vehicle charging points in the basement, pre-installation for photovoltaic solar panels, pre-installation of alarm.
Completion scheduled for the end of 2024.